Designed, constructed and assembled within a short period of 5 months, this project is a classic case of modular construction.
Consisting of 2 x 40ft containers, the building was designed to accommodate the staff who operate the park. The building includes a lunchroom, a communal office space and a dedicated office, as well as a toilet and several storage compartments. With high standards in insulation and ventilation as with all our projects, this building ensures utmost comfort for the residents, which is often overlooked for office spaces.
We are delighted to have provided such a successful alternative for Campbelltown Council to save both their construction time and costs. If you are looking to achieve the same results, contact us now to find out how Sonic Steel can deliver your project!